Video footage, Kowloon Walled City research project, cassette 11, Kowloon Tong office, routes 4-7, clearance九龍城寨研究項目錄影帶十一:顯示何弢位於九龍塘的辦公室、城內路線四至七和清拆情況的片段
23 February 1992–3 March 1992
Includes footage of Tao Ho’s Container Office (1989-1992) in Kowloon Tong before it was dismantled in 1992 on the basis of illegal construction (23 February 1992). Also includes footages of the alleys and shop interiors of Kowloon Walled City (24 February 1992 and 2 March 1992), as well as scenes of police and the media at the perimeter of the city, possibly before a particular phase of its clearance (3 March 1992).